High Efficiency, Tight Footprint
SIHF Healthcare’s Belleville Family/Convenient Care Center now runs on a modern, high-efficiency heating plant built to support the next chapter of care in the community. Two Lochinvar FTX850 boilers, supplied by Behrmann Company and installed by Ehret Inc. and Hock Mechanical, replaced an aging system in the middle of a major renovation — without asking a busy medical building to slow down.

Facility
Built in 1989, the SIHF Heathcare Building in Belleville, IL was due for an upgrade.

Boilers
2 Lochinvar FTXL Condensing Boilers will provide plenty of high-efficiency heat from a small plant.

Pumps
Taco pumps will keep the system flowing.

Install
We worked with Hock Mechanical and Ehret Inc. to make sure the product was installed and is running perfectly.
Two Lochinvar FTX850 boilers brought high-efficiency heat to a nearly 40-year-old medical building — fitting a tight footprint and keeping disruption to a minimum for the patients SIHF serves.
A deeper Dive

Summation
Renovating a nearly 40-year-old medical building means balancing modern performance against old-building realities. At SIHF Healthcare’s Belleville Care Center, Behrmann, Lochinvar, Ehret Inc. and Hock Mechanical delivered a high-efficiency condensing boiler plant that fit the space, respected the building’s patients and staff, and positions the facility for years of reliable service.
